• Latest
  • Trending
  • All
  • Egypt
  • Business
  • Local
  • World
Key reactor component installed at El Dabaa

Key reactor component installed at El Dabaa

October 24, 2026
FM: Egypt’s stability, diplomacy key to regional security

FM: Egypt’s stability, diplomacy key to regional security

November 19, 2026
Russia, China, Iran say IAEA work can resume once fighting ends

Russia, China, Iran say IAEA work can resume once fighting ends

November 18, 2026
Sisi sees off Saudi Crown Prince at Cairo Airport

Sisi praises US Congress for honouring Sadat with Gold Medal

November 18, 2026
US Congress honours Sadat with highest civilian award

US Congress honours Sadat with highest civilian award

November 18, 2026

Gov’t expands hydraulic fracturing, horizontal drilling to boost oil, gas production

November 18, 2026
Israel launches ground operation in central Gaza

Israel launches ground operation in central Gaza

November 18, 2026
TradeTech Sandbox launched to accelerate foreign trade digitalisation

TradeTech Sandbox launched to accelerate foreign trade digitalisation

November 18, 2026
Xi, Putin blast Western ‘protectionism’, sanctions

Xi, Putin blast Western ‘protectionism’, sanctions

November 18, 2026
Egypt’s FM, US Senator McCormick discuss regional tensions

Egypt’s FM, US Senator McCormick discuss regional tensions

November 18, 2026
Gov’t expands hydraulic fracturing, horizontal drilling to boost oil, gas production

Gov’t expands hydraulic fracturing, horizontal drilling to boost oil, gas production

November 18, 2026
  • Advertise
  • Privacy & Policy
  • Contact
Thursday, November 19, 2026
  • Login

Editor-in-Chief

Mohamed Fahmy

Board Chairman

Tarek Lotfy

Egyptian Gazette
No Result
View All Result
  • HOME
  • EGYPT
    • Local
    • Features
  • World
    • National Day
  • Technology
  • BUSINESS
    • Real Estate
    • Automotive
  • SPORTS
  • ENTERTAINMENT
    • Arts
    • Health
    • Lifestyle
    • Travel
    • Tourism
    • Odd News
  • Skyward
    • Snippets from EgyptAir history
  • MORE
    • Multimedia
      • Video
      • Podcast
      • Gallery
    • OP-ED
  • HOME
  • EGYPT
    • Local
    • Features
  • World
    • National Day
  • Technology
  • BUSINESS
    • Real Estate
    • Automotive
  • SPORTS
  • ENTERTAINMENT
    • Arts
    • Health
    • Lifestyle
    • Travel
    • Tourism
    • Odd News
  • Skyward
    • Snippets from EgyptAir history
  • MORE
    • Multimedia
      • Video
      • Podcast
      • Gallery
    • OP-ED
No Result
View All Result
Egyptian Gazette
Home Egypt

Key reactor component installed at El Dabaa

by Gazette Staff
October 24, 2026
in Egypt
Key reactor component installed at El Dabaa 11 - Egyptian Gazette
Share on FacebookWhatsapp

Egypt’s Nuclear Power Plants Authority (NPPA) has begun installing the pressuriser in the primary circuit of the first reactor unit at the El Dabaa Nuclear Power Plant, marking another major milestone in the project’s development.

The authority announced the achievement during Egypt Forum 2026, only days after completing the installation of the unit’s four steam generators.

The pressuriser is a critical component of the reactor’s primary circuit, responsible for regulating and maintaining coolant pressure within the required operating limits.

The equipment weighs about 200 tonnes, while the primary circuit operates at a pressure of around 161 bar. A bar is a metric unit of pressure.

It also helps limit pressure fluctuations under different operating conditions, supporting system stability and the safety of reactor components in coordination with the plant’s protection, control and nuclear safety systems.

NPPA Chairman Sherif Helmy said the installation is particularly significant as it coincided with Egypt Forum 2026, highlighting tangible progress in the projects main components.

He added that the project supports Egypt’s efforts to strengthen energy security, diversify electricity sources and advance sustainable development.

The NPPA said the successive installation of major equipment reflects its commitment to completing the project according to schedule while meeting technical specifications, quality requirements and nuclear safety standards.

The El Dabaa plant is being built in co-operation with Russian contractor Atomstroyexport (ASE). It comprises four VVER-1200 nuclear units, each with a capacity of 1,200 megawatts, bringing the plant’s total installed capacity to 4,800 megawatts.

Tags: EgyptEl Dabaa Nuclear PlantTop_News
ADVERTISEMENT
egyptian-gazette-logo

The Egyptian Gazette is the oldest English-language daily newspaper in the Middle East.
It was first published on January 26, 1880 and it is part of El Tahrir Printing and Publishing House.

Follow Us

FM: Egypt’s stability, diplomacy key to regional security

Russia, China, Iran say IAEA work can resume once fighting ends

Sisi praises US Congress for honouring Sadat with Gold Medal

US Congress honours Sadat with highest civilian award

Gov’t expands hydraulic fracturing, horizontal drilling to boost oil, gas production

  • Advertise
  • Privacy & Policy
  • Contact

Copyrights for © Egyptian Gazette - Administered by Digital Transformation Management.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • HOME
  • EGYPT
    • Local
    • Features
  • World
    • National Day
  • Technology
  • BUSINESS
    • Real Estate
    • Automotive
  • SPORTS
  • ENTERTAINMENT
    • Arts
    • Health
    • Lifestyle
    • Travel
    • Tourism
    • Odd News
  • Skyward
    • Snippets from EgyptAir history
  • MORE
    • Multimedia
      • Video
      • Podcast
      • Gallery
    • OP-ED

Copyrights for © Egyptian Gazette - Administered by Digital Transformation Management.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.