CAIRO – The Egyptian Environment Ministry conducted on Saturday the environmental review of a combine cycle natural gas-fired power plant (Kuraimat II and III) in Giza’s El-Saf area.
In a press release, the ministry said its environmental compliance team made sure that the power plant is connected to the national network for monitoring industrial emissions.
Discussion about this post