Egypt-TEDA SEZONE Development Company hereby declares the result ofthe bidding process for Install Two electromagnetic water meter on 630mm new water line and 630 mm to 2.86 km from MDC Co.belonging to Egypt-TEDA SEZONE Development Company.
This scope of work covers:
Accurately measuring and monitoring the water flow through the main water pipelines, improving water consumption monitoring, and providing reliable flow data for operation, control, and billing purposes.
Install and commission two electromagnetic flow meters.
Monitor the actual water flow through both pipelines.
Improve accuracy of water consumption measurement.
Support water balance and loss monitoring.
Provide reliable flow readings for operational and commercial purposes.
Ensure proper integration of the meters with the existing water network.
After thorough evaluation in accordance with applicable standards and procedures of Egypt TEDA SEZONE Development Company, the tender has been awarded to Madar Innovation Company for submitting a comprehensive proposal that meets all required specifications and conditions, and offers the best competitive value with total rank (Financial) 100%.
Egypt TEDA SEZONE Development Company extends its appreciation to all companies that submitted bids, valuing their participation and interest, and wishing them success in future opportunities.





